Mechanical contractors are often
required to include control panels in their bid. When they wait
until the last minute, Wastech is there to help. Wastech engineers have
the knowledge about control design, panel options and software issues to
make the process simple. These projects always require immediate drawing
submittals.
Wastech can provide engineering
drawings quickly, and we seldom need more than minor revisions since
our package is always complete. The installed unit comes with CAD wiring
diagrams included in the box, all wires labeled and color coded, and the
drive programmed during startup by one of our engineers. Wastech is
known for its high
craftsmanship standards.
You will never be embarrassed by
a Wastech panel.

In the above situation, the
contractor had a large neutralization system using an existing 10,000
gallon tank. The tank was mixed using two large recirculation pumps. Two
large motor-driven metering pumps with 1.5 HP motors were needed to
inject caustic soda. The system required a three-phase panel, a VFD
(“variable frequency drive” for those new players out there), a pH
controller, a Wastech
Series 800 Strip Chart Recorder, a disconnect (required for
three-phase power), an E-Stop, and HOA switches. The panel was specified
stainless steel and required a glass door (which we had in stock). The
tricky part was a poorly defined “ventilation” requirement for the
panel. Wastech designed louver
vents placed high and low on the enclosure, and presented the concept to the
consulting engineer.
The project came in under the
contractor’s budget (much to his surprise). Wastech's quality made the
process painless.